Beacon was awarded a contract with the Maine Army National Guard (MEARNG) to oversee the removal of soil that had been impacted by an oil spill within their boiler room. As the soil was beneath a boiler, Beacon subcontracted to have the boiler moved, the concrete floor removed and then oversaw the removal of impacted soil with a vactor. We then oversaw the placement of crushed stone, a vapor barrier, concrete, and movement and refiring of the boiler.